Texas House of Representatives · 90th Legislature, Regular Session
Official title: Relating to a study and report on burying power lines in the Gulf Coast region.
Members who authored, joint-authored, or co-sponsored this bill.
SourceLegiScan (CC BY 4.0)90R
The bill requires the Public Utility Commission of Texas to study burying power lines in what the bill calls the "study area," which it defines as the part of the state within 150 miles of the coast of the Gulf of Mexico. The bill states the legislature's findings that this area is prone to weather-related power outages, that underground lines hold up better than overhead lines in extreme weather, and that burying lines there could reduce such outages. The commission must evaluate four things for the study area: the potential cost of burying existing overhead power lines, the potential cost of maintaining and repairing underground lines, the potential cost savings from fewer weather-related outages, and the potential use of technologies developed or tested in a Department of Energy program on undergrounding power lines for reliability, resilience, and security. The commission must then send a report of the study results and any recommendations to the governor, the lieutenant governor, and the speaker of the house of representatives by September 1, 2028. The bill does not require any power lines to be buried, and it does not state the cost of the study, so the fiscal note would be the place to look for that. The bill takes effect September 1, 2027, and expires October 31, 2028.
Read the full text below for the definitive meaning.
Each version links to the authoritative document on capitol.texas.gov.
90R3895 EMS-D By: Lalani H.B. No. 601 A BILL TO BE ENTITLED AN ACT relating to a study and report on burying power lines in the Gulf Coast region. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. DEFINITIONS. In this Act: (1) "Commission" means the Public Utility Commission of Texas.
(2) "Study area" means the area in the state located within 150 miles of the coast of the Gulf of Mexico. SECTION 2. FINDINGS. The legislature finds that: (1) the study area is prone to weather-related power outages; (2) underground power lines are more resistant than overhead power lines to extreme weather conditions; and (3) burying power lines in the study area could reduce the number of weather-related power outages in the study area. SECTION 3. STUDY. The commission shall evaluate for the study area the potential: (1) cost of burying existing overhead power lines; (2) cost of maintaining and repairing underground power lines; (3) cost savings associated with reduced weather-related power outages; and (4) use of technologies developed or tested in the Department of Energy's Grid Overhaul with Proactive, High-Speed Undergrounding for Reliability, Resilience, and Security program in the study area. SECTION 4. REPORT. The commission shall submit a report of the results of the study and any recommendations to the governor, lieutenant governor, and speaker of the house of representatives not later than September 1, 2028. SECTION 5. EXPIRATION DATE. This Act expires October 31, 2028. SECTION 6. EFFECTIVE DATE. This Act takes effect September 1, 2027.
Each subject links to other 90R bills tagged the same way.
SourceLegiScan (CC BY 4.0)subject tags
SourceTexas Legislative Council (capitol.texas.gov)90R
No recorded roll-call votes on this bill.
SourceLegiScan (CC BY 4.0)90R
No fiscal notes or analyses recorded for this bill.
SourceLegiScan (CC BY 4.0)official fiscal notes & analyses (TLC)
Perch never collects comments itself — it points you to the Legislature's own hearing schedule and official public-comment channels (ADR-0007).
Official hearings & comment (capitol.texas.gov) →SourceTexas Legislative Council (capitol.texas.gov)official bill text (capitol.texas.gov)