Texas House of Representatives · 90th Legislature, Regular Session
Official title: Relating to county noise study requirements and site construction approval for facilities operated by certain large load electric customers, authorizing a fee.
Members who authored, joint-authored, or co-sponsored this bill.
SourceLegiScan (CC BY 4.0)90R
The bill lets a county commissioners court adopt an order requiring site construction approval, a county permit, before a "covered facility" is built or expanded in the county's unincorporated area. A covered facility is a site's buildings and equipment, including cooling and backup generators, used by a "large load customer," meaning an entity described by Section 37.0561(a), Utilities Code, that is subject to the interconnection standards under Section 37.0561(c), or its successor. The order must cap sound at the nearest point of each affected neighbor's property line, at all hours, at 55 A-weighted decibels, written dB(A), for homes and farm or rural land, 60 dB(A) for homes in mixed residential and commercial developments, 65 dB(A) for commercial, civic, or institutional property, and 70 dB(A) for industrial property. Before approval, the customer must publish online a noise study by a licensed Texas engineer, and the county may approve only if the facility is projected to meet those limits. The customer must also submit a post-construction noise study between one month and 12 months after routine operations begin, and the county must respond within 30 days. If a study shows noncompliance, the county must require a corrective action plan, and it must give notice, a chance to cure, and a hearing before revoking approval. The county may charge a fee no greater than its reasonable review cost, and the bill applies only to projects whose first permit application is filed on or after September 1, 2027.
Read the full text below for the definitive meaning.
Each version links to the authoritative document on capitol.texas.gov.
By: Bhojani H.B. No. 547 A BILL TO BE ENTITLED AN ACT relating to county noise study requirements and site construction approval for facilities operated by certain large load electric customers, authorizing a fee. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Subchapter B, Chapter 37, Utilities Code, is amended by adding Section 37.0562 to read as follows: Sec. 37.0562. COUNTY NOISE STUDIES FOR LARGE LOAD
CUSTOMERS. (a) In this section, "large load customer" means an entity described by Section 37.0561(a) that is subject to the interconnection standards required under Section 37.0561(c), including a successor in interest to the entity. (b) A county may require a large load customer that proposes to construct or expand a facility in the unincorporated area of the county to prepare, submit, and publicly post pre-construction and post-construction noise studies in accordance with Subchapter G, Chapter 233, Local Government Code. (c) A county may condition the issuance and continued validity of a site construction approval for a facility described by Subsection (b) on compliance with the noise study, publication, and mitigation requirements established under Subchapter G, Chapter 233, Local Government Code. (d) This section does not authorize a county to regulate the interconnection or transmission service of an electric utility or to prevent compliance with a lawful instruction issued by the independent organization certified under Section 39.151 for the ERCOT power region during an energy emergency. SECTION 2 . Chapter 233, Local Government Code, is amended by adding Subchapter G to read as follows: SUBCHAPTER G. NOISE STUDIES AND SITE CONSTRUCTION APPROVAL FOR LARGE LOAD CUSTOMER FACILITIES Sec. 233.171. DEFINITIONS. In this subchapter: (1) "A-weighted sound level" means a sound level expressed in A-weighted decibels, or dB(A), measured using the A-weighting network of a sound level meter. (2) "Covered facility" means a building, group of buildings, or associated equipment at a single site in the unincorporated area of a county that is proposed to be constructed or expanded for use by a large load customer in connection with a new or expanded interconnection subject to Section 37.0561(c), Utilities Code. The term includes exterior cooling, ventilation, mechanical, and customer-owned backup generating equipment serving the site. (3) "Large load customer" has the meaning assigned by Section 37.0562(a), Utilities Code. (4) "Noise study" means an acoustical assessment prepared or certified by an engineer licensed to practice professional engineering in this state who has experience in acoustical measurement or modeling. (5) "Receiving property" means real property other than the covered facility site at which sound attributable to the covered facility is assessed under this subchapter. (6) "Site construction approval" means the permit or other authorization issued by a county under this subchapter before construction or expansion of a covered facility may begin. Sec. 233.172. COUNTY AUTHORITY; APPLICABILITY. (a) The commissioners court of a county may by order adopt a program requiring site construction approval for a covered facility. An order adopted under this section applies only in the unincorporated area of the county. (b) A county that adopts an order under this section may: (1) require the large load customer or a person acting on the customer's behalf to submit a pre-construction noise study and proof of public posting as a condition of site construction approval; (2) condition site construction approval on implementation of noise mitigation measures necessary to satisfy Section 233.173; (3) require submission and public posting of a post-construction noise study and any necessary corrective measures as a continuing condition of site construction approval; and (4) designate an official or department to review applications, determine compliance, and administer and enforce this subchapter. (c) The authority granted by this subchapter is express statutory authority to require the noise studies, site plans showing noise mitigation measures, and other documents specified by this subchapter. The authority is separate from, and does not expand, a county's general authority to regulate land use or zoning. (d) The commissioners court may adopt reasonable administrative procedures and charge a fee not greater than the county's reasonable cost of reviewing an application, verifying publication, and administering this subchapter. Sec. 233.173. MAXIMUM SOUND LEVELS. (a) An order adopted under Section 233.172 must require that sound attributable to routine operation of a covered facility, measured at the nearest point on each affected receiving property line, not exceed the following maximum A-weighted sound levels: (1) 55 dB(A) for a property used for a dwelling or primarily for agricultural or rural purposes; (2) 60 dB(A) for a dwelling unit located within a mixed residential and commercial development; (3) 65 dB(A) for property used primarily for commercial, civic, or institutional purposes; and (4) 70 dB(A) for property used primarily for industrial purposes. (b) The maximum sound levels under Subsection (a) apply at all times of day and night. A county shall classify receiving property according to its existing lawful use or an approved residential development plan, regardless of whether the property is subject to zoning. If more than one category applies, the more protective maximum sound level controls. (c) In determining compliance, sound originating from sources not associated with the covered facility must be identified and excluded to the extent practicable using generally accepted acoustical methods. A covered facility is not required to reduce unrelated pre-existing ambient sound. (d) This section does not apply to sound generated by aircraft, temporary construction or maintenance activity, or customer-owned backup generating equipment operating during an actual emergency or pursuant to a lawful direction of an electric utility or the independent organization described by Section 39.151, Utilities Code. This exception does not apply to routine generator testing or commissioning. (e) This section does not authorize a violation of a state or federal environmental law or a permit issued under that law. Sec. 233.174. NOISE STUDY AND MEASUREMENT STANDARDS. (a) A noise study required under this subchapter must be prepared or certified by a professional engineer described by Section 233.171(4) and must identify the methods, equipment, locations, dates, operating conditions, assumptions, and results used in the study. (b) A pre-construction noise study must: (1) document existing ambient sound conditions at the time of the initial site construction approval application; (2) model the projected sound attributable to the covered facility at the receiving property lines under anticipated routine operating conditions, including cooling, ventilation, and routine generator testing; (3) identify each affected receiving property, the applicable maximum sound level under Section 233.173, and whether the projected sound will comply with that level; and (4) identify proposed mitigation measures if the projected sound level would otherwise exceed the applicable maximum. (c) A post-construction noise study must measure sound produced under representative operating conditions and evaluate compliance with Section 233.173. If the facility has not reached its reasonably anticipated maximum routine operating load, the study must also include modeling of that load. (d) Except as provided by Subsection (e), measurements under this section must: (1) use an integrating sound level meter meeting or exceeding ANSI S1.43-1997, Type 1, or an equivalent successor performance standard; (2) use the FAST response setting and a 15-second sampling interval, except that the engineer may select a period of at least 10 seconds and not more than one minute if the 15-second interval does not adequately characterize the sound; (3) include at least three samples in which the subject sound is identifiable and extraneous sounds that would materially distort the result are excluded, together with a background sample when practicable; (4) use the arithmetic average of samples showing repeatability and consistency to determine the sound level for comparison with Section 233.173; and (5) be taken at the nearest point on the receiving property line, with the microphone directed toward the source and positioned five feet above grade, unless physical circumstances require a documented alternative. (e) For a dwelling unit in a mixed-use development, measurement may be made at an open window, door, or other aperture nearest the source, with a windscreen-equipped microphone positioned at the aperture and directed toward the source. This subsection does not authorize entry on private property without permission. Sec. 233.175. PUBLICATION OF NOISE STUDIES. (a) A large load customer subject to a county order under Section 233.172 shall publish a publicly accessible version of each pre-construction and post-construction noise study on an Internet website accessible to the public without charge or registration and shall provide the county with the Internet address and a copy of the study. (b) The pre-construction noise study must be published before the county issues site construction approval and remain publicly accessible while construction is underway. The post-construction study must be published not later than the date the study is submitted to the county and remain publicly accessible for at least three years after publication. (c) Each published study must include the applicable sound limits, measurement or modeling methodology, results for receiving properties, the engineer's conclusions, and required mitigation measures. A customer may redact only information that is confidential under state or federal law, including qualifying security-sensitive or protected commercial information. A redaction may not conceal the sound levels, compliance findings, or required mitigation measures. (d) A county shall make the link to each published study available on the county's website or, if the county does not maintain a website, make the study available for public inspection at the office of the county clerk. Sec. 233.176. SITE CONSTRUCTION APPROVAL; SUBSEQUENT STUDY. (a) In a county that has adopted an order under Section 233.172, a large load customer may not begin construction or expansion of a covered facility without site construction approval issued under this subchapter. (b) The county may issue site construction approval only after the applicant: (1) submits the pre-construction noise study required by Section 233.174; (2) establishes that the study has been published as required by Section 233.175; (3) demonstrates that the covered facility, with any mitigation measures incorporated into the site plan, is projected to meet Section 233.173; and (4) agrees in writing to submit and publish the post-construction noise study and implement any required corrective measures as conditions of the approval. (c) A site construction approval issued under this subchapter is expressly conditioned on timely submission and publication of a post-construction noise study. The customer shall submit the post-construction study to the county not earlier than one month and not later than 12 months after the facility first begins routine operations. (d) Not later than the 30th day after the county receives a complete post-construction noise study, the county shall issue a written determination of compliance or specify deficiencies and the mitigation required. If compliance is shown, the county shall issue a final noise compliance certificate. A facility may operate during the period allowed for the post-construction study subject to the conditions of its site construction approval and other applicable law. (e) An order adopted under this subchapter may require an additional post-construction study following a material modification to equipment at a covered facility that the county reasonably determines is likely to increase sound at a receiving property. (f) A permit or approval required under this subchapter does not replace any other permit required by law. Review of a subdivision plat or development plan remains subject to Chapter 232 and other applicable law. Sec. 233.177. NOISE MITIGATION; ENFORCEMENT. (a) If a required noise study indicates that a covered facility will exceed or exceeds an applicable maximum sound level, the large load customer shall submit to the county an affidavit or certificate signed by the professional engineer identifying the mitigation measures needed for compliance. (b) Mitigation measures must be identified and labeled on the site plan and may include acoustical barriers, mechanical equipment enclosures, revised equipment placement, or other sound-control measures. A pre-construction plan showing projected exceedances may not be approved unless the proposed mitigation is projected to bring the facility into compliance. (c) If a post-construction study shows noncompliance, the county shall provide written notice describing the violation and require a corrective action plan with a reasonable deadline, not later than the 90th day after notice unless an extension is justified in writing. The county may require an additional engineer-certified verification study after mitigation is installed. (d) The county attorney, district attorney, or other attorney representing the county may bring an action in district court for injunctive relief to prevent construction without required site construction approval or to compel compliance with the publication, post-construction study, or mitigation conditions of an approval. A remedy affecting operation of a facility must be tailored to avoid interfering with a lawful electric system emergency instruction. (e) Before revoking a site construction approval for a violation of this subchapter, the county shall provide written notice, a reasonable opportunity to cure, and an opportunity for a hearing before the commissioners court or a designated hearing officer. Sec. 233.178. LIMITATIONS; OTHER LAW. (a) This subchapter does not authorize a county to adopt zoning regulations, regulate an electric utility's rates or interconnection service, or impose a condition inconsistent with a state or federal permit. (b) The applicability of this subchapter to a project is subject to Chapter 245, including any vested rights protected by that chapter. (c) Nothing in this subchapter limits a municipality's authority within its corporate limits or authorizes a county to require access to private property without consent or other lawful authority. SECTION 3 . The changes in law made by this Act apply only to construction or expansion of a covered facility for which an initial application for a permit for the project is filed on or after September 1, 2027. Construction or expansion of a covered facility for which the initial permit application was filed before that date is governed by the law in effect when the application was filed, and the former law is continued in effect for that purpose. SECTION 4. This Act takes effect September 1, 2027.
Each subject links to other 90R bills tagged the same way.
SourceTexas Legislative Council (capitol.texas.gov)90R
No recorded roll-call votes on this bill.
SourceLegiScan (CC BY 4.0)90R
No fiscal notes or analyses recorded for this bill.
SourceLegiScan (CC BY 4.0)official fiscal notes & analyses (TLC)
Perch never collects comments itself — it points you to the Legislature's own hearing schedule and official public-comment channels (ADR-0007).
Official hearings & comment (capitol.texas.gov) →SourceTexas Legislative Council (capitol.texas.gov)official bill text (capitol.texas.gov)
SourceLegiScan (CC BY 4.0)subject tags