Texas Senate · 89th Legislature, Regular Session
Official title: Relating to the reliability of the electricity supply chain.
Members who authored, joint-authored, or co-sponsored this bill.
SourceLegiScan (CC BY 4.0)89R
The bill amends Section 38.077 of the Utilities Code and retitles it from load shedding exercises to reliability exercises. It defines a "critical facility" as a transmission substation and any associated control centers that, if rendered inoperable or damaged because of a physical attack, could cause widespread instability, uncontrolled separation, or cascading outages within an interconnection. It continues to require the commission and the independent organization certified for the ERCOT power region under Section 39.151 to conduct simulated or tabletop load shedding exercises with providers of electric generation service and of transmission and distribution service, including at least one such exercise during a summer month and one during a winter month each year. It adds a requirement that the commission and that organization conduct simulated or tabletop exercises at least once every two years to mitigate and prepare for a threat of an attack or an actual physical attack on a critical facility, in addition to those existing exercises and to the North American Electric Reliability Corporation Critical Infrastructure Protection plan standards. These added exercises must identify the roles and responsibilities of transmission and distribution service providers, providers of electric generation service, law enforcement, the certified independent organization, and the commission in the event of such a threat or attack. The bill states that a transmission and distribution service provider is not required to disclose the specific location of its critical substations for these exercises, and that each participating provider must give the independent organization a written attestation that it coordinated with law enforcement when identifying those roles. It requires the commission and the organization to conduct one of the added exercises with each provider not later than December 31, 2026. The Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, and otherwise takes effect September 1, 2025.
Read the full text below for the definitive meaning.
Taller bars are bigger costs to the fund (money out). A bar below the line, marked with a plus, is a gain (money in).
| Fiscal year | Cost to General Revenue-Related Funds |
|---|---|
| 2026 | $329,953 |
| 2027 | $329,953 |
| 2028 | $329,953 |
| 2029 | $329,953 |
| 2030 | $329,953 |
Methodology: Based on the analysis of the PUC, this estimate assumes the agency would require 3.0 additional full time equivalents (FTE) positions to implement the provisions of the bill due to increased work demand for the Critical Infrastructure Security and Risk Management team with Statewide Operations Center (SOC) activations. Three Project Specialist V ($82,000 per year with estimated benefits of $23,304) would be needed to coordinate the simulated exercises, conduct outreach and training with the affected utilities, and participate in the physical security tabletop exercises with the utilities. Other associated costs include $6,210 per year for payroll contributions, travel and other operating expenses. Local Government Impact: No significant fiscal implication to units of local government is anticipated.
Source: Legislative Budget Board fiscal note, prepared with the Public Utility Commission Of Texas. Read the full fiscal note
Each version links to the authoritative document on capitol.texas.gov.
S.B. No. 2148 AN ACT relating to the reliability of the electricity supply chain. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 38.077, Utilities Code, is amended to read as follows: Sec. 38.077. RELIABILITY [ LOAD SHEDDING ] EXERCISES. (a) In this section, "critical facility" means a transmission substation and any associated control centers that, if rendered inoperable or damaged because of a physical attack, could cause
Each subject links to other 89R bills tagged the same way.
SourceLegiScan (CC BY 4.0)subject tags
widespread instability, uncontrolled separation, or cascading outages within an interconnection. (b) The commission and the independent organization certified for the ERCOT power region under Section 39.151 shall conduct simulated or tabletop load shedding exercises with providers of electric generation service and transmission and distribution service in the ERCOT power region. [ (b) ] The commission shall ensure that each year at least one simulated or tabletop load shedding exercise is conducted during a summer month and one simulated or tabletop load shedding exercise is conducted during a winter month. (c) The commission and the independent organization certified for the ERCOT power region under Section 39.151 shall conduct simulated or tabletop exercises with providers of electric generation service and transmission and distribution service in the ERCOT power region to mitigate and prepare for a threat of an attack or an actual physical attack on a critical facility. The exercises required by this subsection are in addition to the exercises required by Subsection (b) and any requirements of the North American Electric Reliability Corporation Critical Infrastructure Protection plan standards. The commission and the independent organization shall conduct the exercises under this subsection at least once every two years. (d) A simulated or tabletop exercise conducted under Subsection (c) must identify the roles and responsibilities of the following in the event of a threat of an attack or an actual physical attack on a critical facility: (1) transmission and distribution service providers; (2) providers of electric generation service; (3) law enforcement; (4) the independent organization certified for the ERCOT power region under Section 39.151; and (5) the commission. (e) A transmission and distribution service provider is not required to disclose the specific location of the provider's critical substations to the commission or the independent organization certified for the ERCOT power region under Section 39.151 for the purposes of a simulated or tabletop exercise conducted under Subsection (c). (f) Each provider of electric generation service and of transmission and distribution service that participates in a simulated or tabletop exercise conducted under Subsection (c) shall provide to the independent organization certified for the ERCOT power region under Section 39.151 a written attestation that the provider has coordinated with law enforcement when identifying roles and responsibilities under Subsection (d). SECTION 2. Not later than December 31, 2026, the Public Utility Commission of Texas and the independent organization certified under Section 39.151, Utilities Code, for the ERCOT power region shall conduct a simulated or tabletop exercise with each provider of electric generation service and of transmission and distribution service as required by Section 38.077(c), Utilities Code, as added by this Act. SECTION 3. This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2025. ______________________________ ______________________________ President of the Senate Speaker of the House I hereby certify that S.B. No. 2148 passed the Senate on April 10, 2025, by the following vote: Yeas 30, Nays 0. ______________________________ Secretary of the Senate I hereby certify that S.B. No. 2148 passed the House on May 24, 2025, by the following vote: Yeas 132, Nays 0, three present not voting. ______________________________ Chief Clerk of the House Approved: ______________________________ Date ______________________________ Governor
SourceTexas Legislative Council (capitol.texas.gov)official bill text (capitol.texas.gov)
SourceTexas Legislative Council (capitol.texas.gov)89R
Recorded as a group vote — the source has the totals above but no individual member breakdown.
Recorded as a group vote — the source has the totals above but no individual member breakdown.
SourceLegiScan (CC BY 4.0)89R
SourceLegiScan (CC BY 4.0)official fiscal notes & analyses (TLC)
Perch never collects comments itself — it points you to the Legislature's own hearing schedule and official public-comment channels (ADR-0007).
Official hearings & comment (capitol.texas.gov) →SourceLegiScan (CC BY 4.0)hearing schedule