The bill directs the Public Utility Commission of Texas to adopt by rule standards for the structural integrity of transmission and distribution poles, which are the poles that carry electric lines, and applies those standards to electric utilities, municipally owned utilities, and electric cooperatives. New Section 38.006 requires those standards to make a utility inspect, maintain, remediate, and replace poles as necessary on a timeline the commission sets, and to keep records of those actions. The standards must also account for the state's geographic and weather characteristics, consider national guidelines such as the National Electrical Safety Code and guidelines from the Rural Utilities Service of the United States Department of Agriculture, and establish a system to classify how serviceable each pole is. Not later than May 1 of each year, each electric utility, municipally owned utility, and electric cooperative must report to the commission on its pole maintenance schedule and its inspection results, including the number of poles inspected and any remediation or replacement taken. The commission may impose an administrative penalty under Section 15.023 against a municipally owned utility or electric cooperative that violates the section or a rule adopted under it. The bill also lets the commission, at a utility's next rate proceeding, reduce the utility's return on equity for infrastructure used to repair or replace parts of the system damaged by a weather-related event or natural disaster when the utility failed to comply with the Section 38.006 standards. It lowers the threshold at which the commission may take enforcement action, so the commission may act when a feeder with 10 or more customers has had a SAIDI or SAIFI average more than 200 percent greater than the system average of all feeders during any two-year period, changed from 300 percent, and it lists factors the commission shall consider, including the feeder's operating and maintenance history and the cause, duration, and estimated cost and benefit of remediating service interruptions. The Act takes effect September 1, 2025.
Read the full text below for the definitive meaning.
Taller bars are bigger costs to the fund (money out). A bar below the line, marked with a plus, is a gain (money in).
| Fiscal year | Cost to General Revenue-Related Funds |
|---|---|
| 2026 | $907,655 |
| 2027 | $907,655 |
| 2028 | $907,655 |
| 2029 | $907,655 |
| 2030 | $907,655 |
Methodology: Based on the analysis of the PUC, this estimate assumes the agency would require 4.5 additional full time equivalents (FTE) positions to implement the provisions of the bill. An Attorney III ($115,500 per year with estimated benefits of $32,825) would be needed for initial and ongoing rule making and updating. An additional 1.5 Engineers III-IV ($115,500 per year with estimated benefits of $32,825) would be needed to provide subject-matter expertise in the rulemaking process, to participate in the process to bring on a contractor to assist with the annual reviews, to monitor and provide oversight to the contractor, and to inventory issues and questions discovered during the report reviews. Lastly, an additional Attorney III ($115,500 per year with estimated benefits of $32,825) and an Investigator IV-VI ($90,000 per year with estimated benefits of $25,578) would be needed for increased enforcement responsibilities with more fines being assessed against utilities, and to ensure utilities' adherence to the standards laid out by rule. Other associated costs include $10,789 per year for payroll contributions, travel, and other operating expenses. According to the PUC, the agency would need an additional $250,000 per year for a contractor to review an estimated 165 annual reports. Local Government Impact: No significant fiscal implication to units of local government is anticipated.
Source: Legislative Budget Board fiscal note, prepared with the Public Utility Commission Of Texas. Read the full fiscal note
Each version links to the authoritative document on capitol.texas.gov.
S.B. No. 1789 AN ACT relating to electric service quality and reliability; providing an administrative penalty. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 36.402, Utilities Code, is amended by adding Subsection (b-1) to read as follows: (b-1) Notwithstanding Subsection (b), if an electric utility fails to comply with the standards required by Section 38.006 and the utility's system is damaged by a weather-related
Each subject links to other 89R bills tagged the same way.
SourceLegiScan (CC BY 4.0)subject tags
event or natural disaster, the commission may at the utility's next rate proceeding reduce the utility's return on equity for infrastructure used or installed to repair or replace the damaged portion of the system. SECTION 2. Section 38.005(b), Utilities Code, is amended to read as follows: (b) The commission may take appropriate enforcement action under this section, including action against a utility, if any of the utility's feeders with 10 or more customers has had a SAIDI or SAIFI average that is more than 200 [ 300 ] percent greater than the system average of all feeders during any two-year period[ , beginning in the year 2000 ]. In determining the appropriate enforcement action, the commission shall consider: (1) the feeder's operating and maintenance history; (2) the cause of each interruption in the feeder's service; (3) the duration of each interruption in the feeder's service; (4) any action taken by a utility to address the feeder's performance; (5) [ (4) ] the estimated cost and benefit of remediating a feeder's performance; and (6) [ (5) ] any other relevant factor as determined by the commission. SECTION 3. Subchapter A, Chapter 38, Utilities Code, is amended by adding Section 38.006 to read as follows: Sec. 38.006. STRUCTURAL INTEGRITY STANDARDS FOR TRANSMISSION AND DISTRIBUTION POLES. (a) This section applies only to an electric utility, municipally owned utility, or electric cooperative that operates transmission or distribution assets. (b) The commission by rule shall adopt standards for the structural integrity of transmission and distribution poles. (c) The standards adopted under this section must: (1) require an electric utility to: (A) inspect, maintain, remediate, and replace transmission and distribution poles as necessary on a timeline established by the commission; and (B) maintain records of the actions described by Paragraph (A); (2) account for geographic and weather characteristics of this state; (3) consider national guidelines such as the National Electrical Safety Code and guidelines developed by the Rural Utilities Service of the United States Department of Agriculture; (4) establish a classification system to assess the serviceability of transmission and distribution poles that accounts for pole maintenance and extending the service life of transmission and distribution poles; and (5) consider the characteristics of electric utility, municipally owned utility, and electric cooperative transmission and distribution systems throughout this state. (d) The governing body of a municipally owned utility or an electric cooperative shall adopt for the utility or cooperative, as applicable, the standards adopted by the commission under Subsection (b). If the commission revises the standards adopted under Subsection (b), the governing body of each municipally owned utility and electric cooperative shall adopt the revised standards not later than the 120th day after the effective date of the commission's revised standards. (e) Not later than May 1 of each year, each electric utility, municipally owned utility, and electric cooperative shall submit to the commission a report on: (1) the implementation of the utility's or cooperative's transmission and distribution pole maintenance schedule; (2) the results of the utility's or cooperative's inspection of transmission and distribution poles, including the number of poles inspected and any remediation or replacement action taken; and (3) any other information the commission requires. (f) A municipally owned utility or electric cooperative shall include with the first report required under Subsection (e) after the utility or cooperative adopts initial or revised standards under Subsection (d) an attestation from the utility's or cooperative's highest-ranking representative, official, or officer with binding authority over the utility or cooperative stating that the utility or cooperative has adopted standards in compliance with this section. (g) The commission may impose an administrative penalty under Section 15.023 against a municipally owned utility or electric cooperative for a violation of this section or a rule adopted under this section. SECTION 4. The heading to Subchapter E, Chapter 38, Utilities Code, is amended to read as follows: SUBCHAPTER E. INFRASTRUCTURE IMPROVEMENT AND MAINTENANCE [ REPORT ] SECTION 5. Section 38.101(a), Utilities Code, is amended to read as follows: (a) Not later than May 1 of each year, each electric utility shall submit to the commission a report describing the utility's activities related to: (1) identifying areas that are susceptible to damage during severe weather and hardening transmission and distribution facilities in those areas; and (2) vegetation management[ ; and [ (3) inspecting distribution poles ]. SECTION 6. (a) The changes in law made by this Act to Section 38.005, Utilities Code, apply only to an enforcement action initiated by the Public Utility Commission of Texas on or after the effective date of this Act. An enforcement action initiated before the effective date of this Act is governed by the law in effect immediately before the effective date of this Act, and the former law is continued in effect for that purpose. (b) In adopting rules under Section 38.006, Utilities Code, as added by this Act, the Public Utility Commission of Texas shall allow an electric utility to complete any required inspection, remediation, or replacement of transmission and distribution poles installed before the effective date of the rules according to a reasonable timeline approved by the commission that allows the utility to prioritize high-risk transmission and distribution poles. (c) A municipally owned utility or an electric cooperative operating on the effective date of the initial standards adopted by the Public Utility Commission of Texas under Section 38.006(b), Utilities Code, as added by this Act, shall adopt the standards as required by Section 38.006(d), Utilities Code, as added by this Act, not later than the 120th day after the date the Public Utility Commission of Texas adopts the standards required by Section 38.006(b), Utilities Code, as added by this Act. SECTION 7. This Act takes effect September 1, 2025. ______________________________ ______________________________ President of the Senate Speaker of the House I hereby certify that S.B. No. 1789 passed the Senate on April 23, 2025, by the following vote: Yeas 31, Nays 0; and that the Senate concurred in House amendments on May 26, 2025, by the following vote: Yeas 31, Nays 0. ______________________________ Secretary of the Senate I hereby certify that S.B. No. 1789 passed the House, with amendments, on May 20, 2025, by the following vote: Yeas 107, Nays 40, two present not voting. ______________________________ Chief Clerk of the House Approved: ______________________________ Date ______________________________ Governor
SourceTexas Legislative Council (capitol.texas.gov)official bill text (capitol.texas.gov)
SourceTexas Legislative Council (capitol.texas.gov)89R
Recorded as a group vote — the source has the totals above but no individual member breakdown.
Recorded as a group vote — the source has the totals above but no individual member breakdown.
SourceLegiScan (CC BY 4.0)89R
SourceLegiScan (CC BY 4.0)official fiscal notes & analyses (TLC)
Perch never collects comments itself — it points you to the Legislature's own hearing schedule and official public-comment channels (ADR-0007).
Official hearings & comment (capitol.texas.gov) →SourceLegiScan (CC BY 4.0)hearing schedule