Texas Senate · 89th Legislature, Regular Session
Members who authored, joint-authored, or co-sponsored this bill.
SourceLegiScan (CC BY 4.0)89R
AI summary unavailable. We’re still building out our data, so newer and more active legislation has better coverage.
Each version links to the authoritative document on capitol.texas.gov.
89R10526 ANG-D By: Hall, Sparks S.B. No. 1692 A BILL TO BE ENTITLED AN ACT relating to a limitation on wind and solar installed generation capacity in the ERCOT power region. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 39.1592(a), Utilities Code, is amended to read as follows: (a) This section applies only to an electric generation
facility in the ERCOT power region for which a standard generator interconnection agreement is signed on or after September 1, 2025 [ January 1, 2027, that has been in operation for at least one year ], and that is not a self-generator. SECTION 2. Subchapter D, Chapter 39, Utilities Code, is amended by adding Section 39.1596 to read as follows: Sec. 39.1596. LIMITATION ON WIND AND SOLAR GENERATION CAPACITY. (a) This section applies only to an electric generation facility that: (1) exclusively relies on an energy source derived from wind or the sun; and (2) is subject to a standard generator interconnection agreement. (b) Not later than January 1, 2029, the commission shall determine whether the installed generation capacity from the electric generation facilities described by Subsection (a) is contributing more than 35 percent of the available generation capacity for the ERCOT power region at any time. (c) If the commission determines the installed generation capacity described by Subsection (b) contributes more than 35 percent of the available generation capacity for the ERCOT power region at any time, the commission shall by rule establish a program to require disconnection from the power grid of electric generation facilities as provided by this subsection. The program must: (1) require the disconnection from the power grid of only facilities for which a standard generator interconnection agreement was signed before September 1, 2025; and (2) establish a goal of reducing the installed generation capacity from facilities for which a standard generator interconnection agreement was signed before September 1, 2025, so that the installed capacity from all electric generation facilities exclusively relying on an energy source derived from wind or the sun contributes 35 percent or less of the available generation capacity for the ERCOT power region at any time. (d) After completion of the program required under Subsection (c), the commission may allow the installation of new generation capacity from an electric generation facility described by Subsection (a), regardless of the goal described by Subsection (c)(2), if the facility complies with Section 39.1592. SECTION 3. This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2025.
Each subject links to other 89R bills tagged the same way.
SourceTexas Legislative Council (capitol.texas.gov)89R
No recorded roll-call votes on this bill.
SourceLegiScan (CC BY 4.0)89R
No fiscal notes or analyses recorded for this bill.
SourceLegiScan (CC BY 4.0)official fiscal notes & analyses (TLC)
SourceTexas Legislative Council (capitol.texas.gov)official bill text (capitol.texas.gov)
SourceLegiScan (CC BY 4.0)subject tags
Perch never collects comments itself — it points you to the Legislature's own hearing schedule and official public-comment channels (ADR-0007).