HB 1523 | Relating to a temporary prohibition on the authorization by the Texas Commission on Environmental Quality of the use of a Class V injection well for certain aquifer storage and recovery projects. | Perch
Texas House of Representatives · 89th Legislature, Regular Session
HB 1523 Relating to a temporary prohibition on the authorization by the Texas Commission on Environmental Quality of the use of a Class V injection well for certain aquifer storage and recovery projects.
Sponsors
Who Authored It
Members who authored, joint-authored, or co-sponsored this bill.
By: Gerdes
H.B. No. 1523
A BILL TO BE ENTITLED
AN ACT
relating to a restriction on the authorization by the Texas
Commission on Environmental Quality of the use of a Class V
injection well for certain aquifer storage and recovery projects.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. Subchapter G, Chapter 27, Water Code, is amended
by adding Section 27.1535 to read as follows:
Sec. 27.1535. RESTRICTION ON AUTHORIZATIONS OF USE OF
Show the full textCollapse the text
Categories
Subjects
Each subject links to other 89R bills tagged the same way.
05/28/2025 S Removed from local & uncontested calendar
Change log (49 actions)
Dec 5, 2024Filed
Mar 12, 2025Read first time
Mar 12, 2025Referred to Natural Resources
Apr 23, 2025Scheduled for public hearing on . . .
Apr 23, 2025Considered in public hearing
Apr 23, 2025 considered in committee
Apr 23, 2025Testimony taken/registration(s) recorded in committee
Apr 23, 2025Left pending in committee
Apr 29, 2025Considered in formal meeting
Apr 29, 2025 considered in committee
Apr 29, 2025Reported favorably as substituted
May 7, 2025Comte report filed with Committee Coordinator
CERTAIN CLASS V INJECTION WELLS. (a) This section applies only to
a Class V injection well that is:
(1) located in any portion of the territory of a
groundwater conservation district that is located wholly or partly
in a county that:
(A) has a population of more than 70,000 and less
than 100,000 and contains a portion of the Colorado River; and
(B) is adjacent to a county that has a population
of one million or more; and
(2) used for an aquifer storage and recovery project
operated by a municipally owned utility that primarily provides
water to a municipality that:
(A) has a population of 750,000 or more; and
(B) is located in a county adjacent to a county
described by Subdivision (1).
(b) As a condition of authorizing the use of a Class V
injection well for an aquifer storage and recovery project, the
commission shall require that:
(1) the project withdraw no more water than is
injected into the aquifer;
(2) the project establish monitoring wells;
(3) water quality testing be conducted in accordance
with Section 27.156 and commission rules adopted under that
section; and
(4) well monitoring data obtained under Subdivision
(2) and water quality testing data obtained under Subdivision (3)
be provided to the groundwater conservation district described by
Subsection (a)(1).
(c) Before authorizing the use of a Class V injection well
for an aquifer storage and recovery project, the commission shall
hold a public meeting in the county in which the injection well is
proposed to be located.
(d) The commission may not authorize the use of a Class V
injection well for an aquifer storage and recovery project if the
authorization does not include the terms provided by Subsection
(b).
SECTION 2. This Act takes effect immediately if it receives
a vote of two-thirds of all the members elected to each house, as
provided by Section 39, Article III, Texas Constitution. If this
Act does not receive the vote necessary for immediate effect, this
Act takes effect September 1, 2025.
Source·Texas Legislative Council (capitol.texas.gov)·official bill text (capitol.texas.gov)